Maintenance
How do you manage repairs across a multi-unit portfolio?
By Oscar Mustill, Founder of LeaseLink · Last updated 13 November 2026
Quick answer
Run every repair through one front door, sort it by urgency within minutes, send it to a vetted contractor with photos and access details, and close it only when the tenant confirms the fix. Keep the whole history against the property. That record is what protects you if a tenant complains to the council.
At a glance: priority levels to set
The law doesn't set fixed times for private landlords, apart from "a reasonable time". These are example targets many managing agents use. Set your own and tell tenants what they are.
| Priority | Examples | Example target |
|---|---|---|
| Emergency | Gas leak, no heating or hot water in winter, flooding, unsafe electrics, insecure front door | Make safe within 24 hours |
| Urgent | Blocked only toilet, broken boiler in mild weather, roof leak | Within 3 working days |
| Routine | Dripping tap, sticking window, broken cupboard door | Within 28 days |
| Planned | Redecoration, kitchen or bathroom replacement | Scheduled with the tenant |
For the full emergency triage, with first steps for tenants and landlords, see our guide to emergency repairs.
Emergency repairs: what counts and how fast must a landlord act?Why do repairs go wrong across a portfolio?
Most problems come from repairs arriving through five channels at once: calls, texts, emails, WhatsApp and the office. Nothing has a single owner, the contractor turns up without the right part, and nobody can prove when the tenant first reported it.
How do you set up a repair system that scales?
- One front door. Every tenant reports through the same channel, with photos. Turn off the others, or log them there yourself.
- Triage in minutes. Give each report a priority from the table above and a trade (plumber, electrician, Gas Safe engineer, roofer).
- Approved contractor list. Keep two or three vetted trades per type in each area, with their insurance and registrations on file.
- Approval limits. Agree with each owner the amount you can spend without asking, such as £250.
- Send the job with everything. Photos, access details, the tenant's availability and any key safe code go with the job.
- Close the loop. Ask for after-photos and the invoice, then check with the tenant before closing.
- Review monthly. Look at repeat faults per property and the time to fix per contractor.
What records should you keep?
Keep the date reported, the photos, every message, the priority given, when the contractor attended, the after-photos and the invoice. If a tenant complains to the council, this timeline shows you acted within a reasonable time.
What changes with Awaab's Law?
Awaab's Law does not apply to private landlords yet. It has applied to social landlords since October 2025.
The government is consulting on extending it to private renting. The consultation runs from 09/10/2026 to 18/12/2026. It is a proposal, not law, and no start date has been set.
If it goes ahead, it would set time limits for serious hazards such as damp and mould. A time-stamped repair process now means you'll be ready.
Emergency repairs and Awaab's Law for private renting Damp and mould in a rented property: who is responsible?If you're a tenant
Report every repair in writing, with photos, and keep a copy. A written report starts the clock and is your evidence if you need to contact the council.
How LeaseLink helps
- Tenants report repairs in the app with photos.
- Send jobs to local trades on TradeLink.
- Every message, photo, quote and invoice is saved against the job, with a dated timeline.
- AI triage that suggests the urgency and trade (coming soon).
- Sending jobs to your own contractors (coming soon).
- Team logins for agencies (coming soon).
Frequently asked questions
How quickly must a landlord fix a repair?
Within a reasonable time. Urgency matters: a gas leak needs action the same day; a dripping tap can wait longer.
Should tenants report repairs by phone?
A written report with photos is better for both sides, because it creates a record.
How many contractors should a letting agent use?
Two or three per trade in each area, so one being busy doesn't hold up the job.
What is a maintenance approval limit?
The amount an agent can spend on a repair without asking the owner first. Agree it in your management agreement.
Do I need to check contractors' insurance?
It's good practice. Ask for public liability insurance and proof of Gas Safe or electrical registration where relevant.
What happens if a repair is ignored?
The council can inspect, serve an improvement notice and fine the landlord.
Sources
This is general information for landlords and tenants in England, not legal advice.